SuDS at Binfield Learning Village

14 March 2017

Pictured is the installation of an impressive 1000m3 of geo-cellular storage.

This is part of the Sustainable Drainage System for the all through school, Binfield Learning Village. The system provides storage and attenuation of the surface water run-off, from the southern catchment area of the site, to mimic existing greenfield run-off rates. A treatment management train approach has been adopted upstream of the underground storage in accordance with Ciria C753 guidance, comprising permeable paving, filter drains and oil separator.

Mark Headford Senior Civil Engineer